Most Sutton Coldfield homes are owned, lived in for years and added to. Here is what that means for the wiring, and the questions people ask.
The electrical work in Sutton Coldfield is shaped by the fact that most people own their homes and stay in them, and add to them. In Four Oaks and Little Sutton the houses are large, often detached, and have usually been extended at least once: a kitchen here, a loft there, a garage turned into a room. Each addition was wired by whoever did the building work at the time, so a single house can have circuits from four different decades feeding one consumer unit. That is why an honest test matters more than a quick quote, plenty of those houses need a board and a partial rewire of one old section, not the whole house taken back to the joists. Around Boldmere and Wylde Green it is the semis built between the wars, where the original wiring has mostly gone but the boards that replaced it are often the first generation of consumer units, without the protection a modern board gives each circuit. Out toward Walmley, New Hall and Mere Green the houses are newer and the jobs are additions: a charger on the drive, which means checking the supply will carry it alongside an electric shower and an induction hob, and garden rooms and home offices at the bottom of the garden, which need a proper armoured supply rather than an extension lead through the window. And because Sutton is a town people buy into, the EICR comes up at sale time, when a buyer's surveyor asks for one. Everything is tested, everything is priced in writing before it starts, and the certificate is emailed rather than promised.
Send a photo of the fuse board on WhatsApp and a note of what you want doing, that is usually enough to price it.
A fixed written price for the job: materials, testing, the certificate and making good afterwards, all in.
Installed properly, tested and certificated: the paperwork emailed to you, and the place left clean rather than dusty.
Public-liability insured, with references from regular customers you can check first.
We look at the board and the older sections first, so the quote matches the house rather than a guess made at the door.
Testing and the certificate are in the price. No mess bags left in the hall for a fortnight.
One price for the job, agreed before we start. No day-rate creep and no "the wall was worse than we thought".



Nearly always. The real question is the supply: a 7kW charger running alongside an electric shower and an induction hob can overload an older main fuse. We check before quoting, and if the fuse needs upgrading that is an application to the network operator.
Usually not. Extended houses tend to have circuits of different ages, and the test shows which sections are sound. Often it is a new board and one older section rewired, and we tell you plainly which yours is.
Yes. It needs an armoured cable, usually buried or clipped along a wall, its own protection at the board, and the load worked out so a heater and a computer do not trip it. It is a common job in Mere Green and Walmley.
It is not a legal requirement to sell, but many buyers' surveyors and solicitors ask for one. Having it done early means no surprises and time to fix anything it finds.
Usually a single day, with the power off for part of it. The certificate is emailed the same week.
No. You get a price for the work before anything starts, and that is what you pay.
Bad electrics show up years later and never at a convenient moment: a breaker that trips for no reason, a socket that warms up, an extension that dims the kitchen lights. The test is the job: each circuit checked from the board out, faults written up in plain English, and the paperwork sent before we go.